1 00:00:06,710 --> 00:00:03,889 foreign Russian spacewalk 56 will be 2 00:00:09,589 --> 00:00:06,720 conducted by Sergey prokopiev ev1 and 3 00:00:11,509 --> 00:00:09,599 the red stripes and Dimitri patellen ev2 4 00:00:14,270 --> 00:00:11,519 and the blue stripes 5 00:00:18,950 --> 00:00:14,280 Anna kakina will assist as sudivi and 6 00:00:21,170 --> 00:00:18,960 European robotic arm era operator 7 00:00:23,630 --> 00:00:21,180 to start the spacewalk cruel egress the 8 00:00:25,970 --> 00:00:23,640 poisk airlock with a tool carrier crew 9 00:00:29,570 --> 00:00:25,980 luck bag and an adapter to assist with 10 00:00:34,490 --> 00:00:31,669 after securing the adapter on the 11 00:00:36,049 --> 00:00:34,500 strello 1 translation ring crew will 12 00:00:39,410 --> 00:00:36,059 translate to the forward side of the 13 00:00:43,130 --> 00:00:39,420 poisk module here there will retrieve 14 00:00:47,209 --> 00:00:44,990 Sergey and Dimitri will move along the 15 00:00:50,510 --> 00:00:47,219 strela 2 boom and continue Nader to the 16 00:01:00,350 --> 00:00:52,790 Dimitri will temporarily Stow the era 17 00:01:04,189 --> 00:01:02,029 will move further Nader to the radiator 18 00:01:07,250 --> 00:01:04,199 work site where they'll first work to 19 00:01:11,109 --> 00:01:07,260 disconnect a radiator cable cap it and 20 00:01:16,010 --> 00:01:13,730 nearby the two will remove a protective 21 00:01:18,170 --> 00:01:16,020 cover from the radiator close the fluid 22 00:01:21,830 --> 00:01:18,180 connectors then remove the protective 23 00:01:25,789 --> 00:01:23,749 [Music] 24 00:01:28,130 --> 00:01:25,799 each crew member will open a Nader 25 00:01:36,230 --> 00:01:28,140 radiator launch lock then translate 26 00:01:40,969 --> 00:01:38,510 while the era grapples onto the radiator 27 00:01:44,210 --> 00:01:40,979 Dimitri and Sergey will monitor the 28 00:01:53,510 --> 00:01:46,670 once motion is complete they'll close 29 00:01:58,429 --> 00:01:55,429 and will retrieve the previously stowed 30 00:02:02,210 --> 00:01:58,439 era adapter and install it on the strela 31 00:02:10,130 --> 00:02:04,609 Sergey removes the protective cover and 32 00:02:18,050 --> 00:02:12,410 both crew will begin a long translation 33 00:02:18,060 --> 00:02:28,270 foreign 34 00:02:42,050 --> 00:02:31,309 down to the nooka module well they'll 35 00:02:46,610 --> 00:02:44,690 Dimitri and Sergey will work together to 36 00:02:49,729 --> 00:02:46,620 make three connections on a cable 37 00:02:52,100 --> 00:02:49,739 inspect screws and remove a protective 38 00:02:55,729 --> 00:02:52,110 cover from the interface 39 00:02:58,309 --> 00:02:55,739 [Music] 40 00:03:01,190 --> 00:02:58,319 crew will move to a monitoring position 41 00:03:03,530 --> 00:03:01,200 and provide a go to Anna to maneuver the 42 00:03:04,740 --> 00:03:03,540 radiator in for mating to the nooka 43 00:03:09,410 --> 00:03:04,750 module 44 00:03:15,050 --> 00:03:12,350 after mating the radiator both crew will 45 00:03:25,449 --> 00:03:15,060 perform final mechanical hydraulic and 46 00:03:33,050 --> 00:03:27,710 from there they'll translate backup 47 00:03:37,850 --> 00:03:34,630 foreign 48 00:03:38,869 --> 00:03:37,860 will secure a jettison bundle to strella 49 00:03:40,789 --> 00:03:38,879 one 50 00:03:42,710 --> 00:03:40,799 and after performing a tool inventory 51 00:03:44,990 --> 00:03:42,720 Sergey and Dimitri will Ingress the 52 00:03:50,840 --> 00:03:45,000 airlock and close the hatch ending